Every current and future programme is linked by its programme code. IAS establishes the institution, mandate, acceptance profile, reviewer and reliance conditions before the remaining reviewer route proceeds.
IAS-0 through IAS-X, with receiving-institution authority preserved.
02Review progress
Step 0–6 completion and AC-01–AC-08 assessment coverage, including met, partial, not-met and pending findings.
03Governance risk
Open exceptions, critical blockers and authority-confirmation posture.
04Reliance outputs
Issued assurance statements, controlled releases and external outcomes.
Protected portfolio view
IAS programme status
Signed-in Hub administrators can view bounded portfolio summaries below. Programme evidence and full IAS records remain in their respective protected systems.
Future programme integration contract
One cross-system identifier
Every future project, programme, facility, pilot or portfolio uses the same programme code across the operating and assurance systems.
System
Responsibility
Identifier
Terra Vita Hub
Evidence, execution, reviewer actions and export posture
programme_code
FieldTrace
Attributable field evidence and operator/site identity
programme_code
Capital-Flow Readiness
Readiness gates, blockers and upgrade plans
programme_code
Project Authority Lock
Legal entity, signatory, site and funding-recipient authority
programme_code
IAS
Institutional acceptance, reliance, releases and outcomes